Design, Supply, Construction, Installation, Testing, Commissioning and Operation & Maintenance for 5 (five) years of Seamless Innovative Urban Transportation (Ropeway, Lifts & Escalators Etc.) Network in Shimla City (Himachal Pradesh) on Engineering Procurement and Construction (EPC) Mode.
- Red Line between Taradevi-Chakkar- Tutikandi parking 2.10 km. (3 Stations and 2 Sections).
- Green Line Tutikandi Parking (ZPTH)-ISBT- Railway Station-Old Bus Stand-Lift Point- Secretariat 5.14 Km. (5 Stations 5 Sections).
- Blue Line ISBT-103 Tunnel-Victory Tunnel- ICR-IGMC-Sanjauli- Navbahar -Secretariat 6.55 Km. (6 Stations 7 Sections).
(Reference files CAD thereof)
- 393 Shimla_101_L-section Chakkar – ZPTH_3.000pphd.dwg
- 393 Shimla_109_L-section Lift point 2 – Secretariat_3.000pphd.dwg
- 393 Shimla_106_L-section ISBT – Railway station_3.000pphd.dwg
- 393 Shimla_105_L-section ZPTH – ISBT_3.000pphd.dwg
- 393 Shimla_110_L-section ISBT – 103 tunnel_3.000pphd.dwg
- 393 Shimla_111_L-section 103 tunnel – Victory tunnel_2.500pphd.dwg
- 393 Shimla_116_L-section Navbahar – Secretariat_2.500pphd.dwg
- 393 Shimla_115_L-section Sanjauli – Navbahar_2.500pphd.dwg
- 393 Shimla_114_L-section IGMC – Sanjauli_2.500pphd.dwg
- 393 Shimla_112_L-section Victory tunnel – ICR_2.500pphd.dwg
- 107_L-section Railway station – Old bus stand
- 108_L-section Old bus stand – Lift point
- 393 Shimla_118_L-section ICR – IGMC_2.500pphd_option_D.dwg (1)
- 20230612393 Shimla_100_L-section Taradevi – Chakkar_3.000pphd
- Proposed Site ( Shimla Ropeway ) Both
- 30-12-2024 Architectural dwgs